Current Transformers
Requirements and Specifications
The customer shall supply current transformers when the service is metered at the transformer and when the transformer is installed in an enclosure. Contact Austin Energy Metering for verification at 512-505-7045.
Current Transformer Description |
Possible window type current transformer ratios:
|
Requirements for 5th Terminal Lugs in Meter Socket
- Services that require the voltage of 120/208 Single Phase shall have a 5th terminal lug installed in the 9 o’clock position.
- Services that require the voltage of 125/216 single phase shall have a 5th terminal lug installed in the 9 o’clock position in the metering socket.
- The 5th terminal lug is purchased in addition to the socket being purchased. It is only required for single phase
120/208 and 125/216
volt services. - Meter sockets requiring the 5th lug terminal shall be identical to the sockets specified with the exception that it has the 5th lug terminal installed.
Other Specifications